More details

StopLine3

“PUC Adds Conditions to Enbridge’s Line 3 Approval, But Only Those Acceptable to Enbridge” – Healing MN Stories
“PUC Adds Conditions to Enbridge’s Line 3 Approval, But Only Those Acceptable to Enbridge” – Healing MN Stories
https://seekjoy.co/mmunity/puc-adds-conditions-to-enbridges-line-3-approval-but-only-those-acceptable-to-enbridge-healing-mn-stories/
150 150 The SEEKJOY Community
Video Recap: Block (Line 3) Party at the PUC!
Video Recap: Block (Line 3) Party at the PUC!

We’ve posted a video recap of the 2-day Block (Line 3) Party at the Public Utilities Commission in Downtown St. Paul, Minnesota. The video has additionally been posted to our Facebook Page and is available by clicking HERE. A link to this video via our Wistia hosting channel has been pasted at the bottom of this post!

Read Full Post!
1200 510 The SEEKJOY Community
Block (Line 3) Party @ the PUC Event Recap & Photos
Block (Line 3) Party @ the PUC Event Recap & Photos

A two-day event called the “Block (Line 3) Party” was organized at 121 7th Place East in front of Minnesota’s Public Utilities Commission by MN350: Building a Climate Movement in Minnesota, Sierra Club Northstar Chapter, Honor the Earth and the Power Shift Network to raise awareness about the upcoming decision by the PUC to either approve or deny the permit for Enbridge Energy’s proposed Line 3 Pipeline Replacement Project in Northern Minnesota.

Read Full Post!
1600 1067 The SEEKJOY Community
  • 1
  • 2
Start Typing