180607-seekjoy-SYLFFIRE-StopLine3-Day1_WindPowerInstall-EarthRhythms-IMG_3090-fb.jpg

Wind Turbine Install near Line 3 Pipeline Route

We were invited up to Pure Bliss Ranch as part of Earth Rhythms 2018, a 3-day Music and Arts Festival north of Detroit Lakes, Minnesota on the White Earth Reservation.

We arrived early yesterday morning before the Pre-Party (June 7th, 2018) and immediately began documenting the install of a 10Kw wind turbine which will offset energy on the ranch used to power this and future events.

Below is the video which has been posted on facebook here:

 

A photo gallery of the install can be found here on facebook and in higher resolution on the SEEKJOY Community’s Smugmug Portal

View Full Post
The SEEKJOY CommunityWind Turbine Install near Line 3 Pipeline Route