180607-seekjoy-SYLFFIRE-StopLine3-Day1_WindPowerInstall-EarthRhythms-IMG_3090-fb.jpg

Wind Turbine Install near Line 3 Pipeline Route

We were invited up to Pure Bliss Ranch as part of Earth Rhythms 2018, a 3-day Music and Arts Festival north of Detroit Lakes, Minnesota on the White Earth Reservation.

We arrived early yesterday morning before the Pre-Party (June 7th, 2018) and immediately began documenting the install of a 10Kw wind turbine which will offset energy on the ranch used to power this and future events.

Below is the video which has been posted on facebook here:

 

A photo gallery of the install can be found here on facebook and in higher resolution on the SEEKJOY Community’s Smugmug Portal

The SEEKJOY CommunityWind Turbine Install near Line 3 Pipeline Route
Share this post

Join the conversation